Socio-Economic Impacts of EPA Investments in Priority Great Lakes Watersheds
AMP Insights recently completed a socio-economic analysis of EPA investments aimed at improving water quality in four priority watersheds in the Great Lakes Basin as part of a program evaluation effort undertaken by the Great Lakes Commission, contracted to the EPA.
Guidelines for the Evaluation of Hydropower and Multi-Purpose Project Portfolios (Mekong River Commission)
AMP Insights provided economics input as part of an international consultant team for the Mekong Rover Commission’s (MRC) Initiative on Sustainable Hydropower project developing a report: Guidelines for Multipurpose Evaluation of Hydropower Projects.
Verde River Exchange
Work in the Verde River watershed of central Arizona began in 2014 with a feasibility study for a groundwater mitigation program to mitigate for the impacts of groundwater pumping on Verde River flows. After two years of extensive analysis, stakeholder input and program design, the Verde River Exchange was launched in 2016.